Our Projects — Searchable. Filterable. Real.

9 disclosed projects across solar, battery storage, hydrogen, data centers, EV, factories, and logistics. Filter by category, search by name or keyword, sort by capacity, status, or year.

BESS Galați BESS Portfolio
Modernisation Fund application · 2028

Galați BESS Portfolio

Galați County, Romania

Four stand-alone 4-hour battery storage projects, submitted to the Modernisation Fund in November 2026. Revenues from balancing and wholesale markets through our VPP; first full operating year planned for 2028.

320 MW / 1,280.84 MWh (4 projects)
PV + BESS Galați PV + Storage Cluster
Development · 2027

Galați PV + Storage Cluster

Barcea, Galați County, Romania

Hybrid cluster pairing about 19 MW of solar PV with about 135 MW of battery storage at Barcea, Galați County. Completion targeted for Q4 2027.

~19 MW PV + ~135 MW BESS
PV + BESS Braila Cluster
Permitting · 2027

Braila Cluster

Brăila County, Romania

Hybrid renewable cluster: 18 MWp solar PV paired with a 137.5 MWh battery energy storage system (4-hour duration). Grid-scale dispatch across aFRR, mFRR, and day-ahead markets via our VPP platform.

18 MWp PV + 34.4 MW / 137.5 MWh BESS
BESS BESS City Braila
Permitting · 2027

BESS City Braila

Brăila, Romania

Standalone battery energy storage system, 50 MWh capacity with 4-hour duration. Urban-adjacent siting optimised for frequency response, grid services, and peak-shaving revenue.

12.5 MW / 50 MWh BESS (4-hr)
EV Energy Equipment Showroom
Under Construction · 2026

Energy Equipment Showroom

Tunari, Ilfov, Romania

800 m² showroom on a 4,400 m² site showcasing the future of electric construction equipment. A premier hub for sustainable technology and zero-emission efficiency.

800 m² / 4,400 m² site
Factories Production & Recycling Center
Planning · 2027

Production & Recycling Center

Galați County, Romania

Production and recycling cluster for the circular economy: PV panel recycling (PanelCycle Romania), battery recycling (BESS Recycling Tech) and production of batteries, inverters and EV chargers. Relocated from Dascălu (Ilfov) to Galați in October 2026; launch targeted for Q2 2027.

~30,000 m² cluster (planned)
Logistics Distribution & Logistics Center
Permitting · 2027

Distribution & Logistics Center

Căciulați, Ilfov, Romania

55,000 m² rail-connected distribution and logistics hub for the storage and assembly of large-scale energy infrastructure, including BESS and hydrogen technologies. Completion targeted for Q4 2027.

55,000 m² rail-connected
Data Centers HELIOS DC ONE Hyperscale
Future · 2030

HELIOS DC ONE Hyperscale

Romania

1 GW (1,000 MW IT) AI data center campus concept, built in 4 phases of 250 MW, designed energy-first with ~1,000 MWp dedicated PV and 480 MW / 1.2 GWh BESS. In development, not operational; open to partners under NDA.

1,000 MW IT (4 × 250 MW)
Hydrogen Danubian H₂ Blue Line
Future · 2030

Danubian H₂ Blue Line

Tulcea County, Romania

200 MW green hydrogen electrolysis hub in Tulcea County with dedicated solar and battery storage, supplying hydrogen for shipping on the Danube and the Black Sea. Target 2030.

200 MW electrolysis + dedicated PV & BESS
No projects match your search. Try a different keyword or reset the filters.

We have more in the Pipeline

Our pipeline includes 9 disclosed projects and a 3.9 GWh storage pipeline in development. Additional sites are under NDA. Qualified investors and partners get access to the full deal flow.

Let’s Talk

Evaluating a co-investment?

Full project data rooms, bankable financial models, and site visits are available for qualified institutional investors under NDA.